Excavation and foundation works |
Breakdown of construction lines, land leveling, digging well constructions, foundation of chipping, construction of foundation (including formwork, reinforcement and concreting or installation of prefabricated blocks), insulation of foundation, preparation of ground floor and floor-filling with ground coating. |
|
Bearing walls and chimneys |
Laying of bearing and interior walls (claydit blocks or aircrete), installing link-beam apertures (claydit precast link beams, metal link beams), installing pipes, overcoating of bearing metal structures and stone walls |
|
Inter-floor covering |
Constructing of precast slabs or monolith reinforced concrete |
|
Roof |
Wooden structures, grating, wind sealing, insulation, vapour sealing, roofage, wind boxes, cornices, drainpipes, gutters |
|
Facade decoration |
Insulation, reinforced or painted decorative plaster, socle decoration |
|
Windows, external doors, garage doors |
PVC windows, windows ledges, metal or wooden external doors, sectional liftable garage doors |
|
Floor constructions |
Insulation, reinforcement, underlayment, sealing, installation of OSB and plywood |
|
Walls and ceilings |
dry walls and ceilings from light constructions, metal frame, thermal and acoustic insulation |
|
Preparation and decoration of walls and floors |
puttying and lining, presizing, wallpaper hanging, painting, water proofing, slabbing |
|
Floor covering |
Laminate, linoleum, water proofing, paving tiles |
|
Internal doors |
MDF or wooden doors, fittings |
|
Flight of staircase |
Wooden or metal staircase |
|
Fireplace |
|
|
Heating system |
Heating boiler, heating pipes, heaters, connecting assemblies |
|
Water-carriage system, water-supply |
Water-supply and water-carriage pipes, connection assemblies, plumbing constructions and devices (shower cabins, bath tubes, WC facilities, sinks) |
|
Electric installation works |
Conduit boxes, cables, lamps, sockets, switches |
|
Water-supply |
Conduit of pipes, connecting assemblies, overall length - 15m |
|
Water-carriage |
Conduit of pipes, connecting assemblies, reinforced settling wells, overall length - 15m |
|
Electric installation works |
Electric cables from counter till building, overall length - 15m |
|
Gas-supply |
Conduit of pipes, connecting assemblies, overall length - 25m |
|
Paving of territory |
Overall paving space 90m2 |
|
Planting |
Overall planting space (lawn) - 150m2 |
|
Fencing |
Overall fencing length - 80m |
|
Total:
Costs for 1m2:
|